Available project(s) in Electrical Engineering Discipline
Sr. No.
| Discipline
| Project Duration
| Title
(Click on Title to see the Abstract)
| Project Status
| Date of Upload
| |
IPR/EE/2024/08/220/19
| Electrical
| 25 Weeks
| Open
| 6/8/2024
| ||
IPR/EE/2024/03/194/18
| Electrical
| 8 Weeks
| Preliminary Study and Design Optimization for 15kA current transport bus-bar from 30kA 30V Power Supply to Superconducting load
| Closed
| 1/04/2024
| |
IPR/EE/2024/01/180/16
| Electrical
| 20 Weeks
| Design, Simulation and Prototyping of 300A, 30V High Frequency (10-20KHz) Pulse Power Supply
| closed
| 23/01/2024
| |
IPR/EE/2023/12/164/14
| Electrical
| 25 weeks
| Identification of different faults for magnetic coils in ADITYA-U tokamak
| Closed
| 22/12/2023
| |
IPR/EE/2023/12/159/14
| Electrical
| 25 Weeks
| Study of transformer action between plasma current and Ohmic coil system in ADITYA-U tokamak
| Closed
| 15/12/2023
| |
IPR/EE/2023/12/173/14
| Electrical
| 17 Weeks
| Development of fast modulating multi-phase buck converter
| Closed
| 13/12/2023
| |
IPR/EE/2023/06/121/10
| Electrical
| 25 Weeks
| Analysis of Toroidal field coil temperature in ADITYA-U tokamak
| Closed
| 13/6/2023
| |
IPR/EE/2023/05/124/10
| Electrical
| 6 Weeks
| AIML based Smart fault prediction in power system
| Closed
| 11/5/2023
| |
IPR/EE/2023/03/106/8
| Electrical
| 6 Weeks
| Study of different starting Mechanism of Induction Motors for Helium screw compressors
| Closed
| 6/03/2023
| |
IPR/EE/2023/02/100/7
| Electrical
| 8 Weeks
| Analysis and modeling of fast-modulating multi-phase buck converter
| Closed
| 20/2/2023
| |
IPR/EE/2022/08/39/6
| Electrical
| 40 weeks
| Modelling, Analysis and Prototyping of Multi Level Inverter for Generating High Voltage.
| Closed
| 29/08/2022
| |
IPR/EE/2022/08/38/6
| Electrical
| 40 weeks
| Modelling, Analysis and Prototyping of PWM Rectifier for High Voltage DC Power Supplies.
| Closed
| 29/08/2022
| |
EE-03-2022
| Electrical
| 17 weeks
| Analysis and modelling and validation of High frequency (1MHz) HBridge Inverter
| Closed
| 2/06/2022
| |
EE-02-2022
| Electrical
| 17 weeks
| Analysis modelling and validation of cascaded DC-DC buck converter
| Closed
| 2/06/2022
| |
EE-01-2022
| Electrical
| 6 weeks
| Installation & Interfacing of Soft Charging Controller
| Closed
| 2/06/2022
|
OLD Projects
Sr. No.
| Discipline
| Project Duration
| Title
(Click on Title to see the Abstract)
| Project Status
| Date of Upload
| |
EE-21-04
| M. Tech in Electrical Engineering
| 10 Months
| Electromagnetic field analysis of High Voltage High Frequency (HVHF) Transformer for Nuclear Applications
| Closed
| 3/11/2021
| |
EE-21-03
| M. Tech in Electrical Engineering
| 10 Months
| Line Type Nano-second High Voltage Pulse Generator
| Closed
| 22/10/2021
| |
EE-21-02
| B.E. / B.Tech. Electrical/ Electronics Engineering
| 4 Months
| Design, Simulation & Analysis of 10kV, 15mA Compact HVDC Power Supply
| Closed
| 15/01/2021
| |
EE-21-01
| B.E. / B.Tech. Electrical/ Electronics Engineering
| 4 Months
| Study and analysis of the Soft Charging Circuit for High Voltage Power Supply
| Closed
| 15/01/2021
| |
EE-20-01
| B.E. / B.Tech. Electrical/ Electronics Engineering
| 4 Months
| Design and development of PLC based automation and control system for high power (> 100kW) plasma arc system.
| Closed
| 22/12/2020
| |
EE-19-02
| M.E. / M.Tech. Electrical/ Electronics and Instrumentation Engineering
| 12 Months
| Design and development of IGBT or MOSFET based high voltage high frequency power supplies for atmospheric plasma generation
| Closed
| 08/05/2019
|